According to the Central Electricity Authority (CEA) of India for enabling growth of Renewable Energy (RE) capacity, areas which have high solar and wind energy potential, needs to be connected to Inter-State Transmission System (ISTS), so that the power generated could be evacuated to the load centres.
The Report “Transmission System for Integration of over 500 GW RE Capacity by 2030” portrays the broad transmission system roadmap for reliable integration of 537 GW RE capacity by the year 2030 for major RE potential zones like Leh RE park in Ladakh; Fatehgarh, Bhadla, Bikaner in Rajasthan; Khavda RE park in Gujarat; Anantapur, Kurnool RE Zones in Andhra Pradesh; and offshore wind farms in Tamil Nadu and Gujarat etc.
Additionally, read the Central Electricity Authority (CEA) of India's report on the 2024 installed capacity of the power stations in all of India.
CEA India Report on Transmission Plan for 500 GW RE by 2030
CEA India Report: All India Installed Capacity (In MW) of Power Stations 2024